Intersection of Five Mile Line and Atlantic Ave
Image_Map_AtlanticFiveMileDOT
Category:
State

Image_OverheadAtlanticFiveMile       Image_TrafficFiveMileLine

April 12, 2021: Phase I traffic switch begins. Shifting of East and Westbound Atlantic Ave traffic two feet north within the project limits. Expect traffic delays.
April 8 - 9, 2021: Phase I lead-in signs will be installed  
March 3, 2020:
Open House Meeting at Penfield Town Hall - NYS DOT Department staff on-hand to provide an individual summary of the project

Construction will widen and resurface the existing intersection, add left-turn lanes in each direction, and add a right turn lane southbound on Five Mile Line Road. The traffic signal and sidewalk will be replaced and will include ADA-accessible ramps.

Two-way traffic will be maintained throughout construction using lane shifts and temporary lane closures. Paving may be done during nighttime hours to help prevent further traffic congestion at the intersection.

Motorists will be kept informed with variable message signs and temporary work zone traffic control signs on site. Real-time traffic and construction updates can also be found by visiting www.511ny.org

If you have questions or concerns regarding this project, please contact Brent Woodhouse, Engineer in Charge, at Brent.Woodhouse@dot.ny.gov, or by phone at (585) 261-3077.

Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

Map and Video Summary2 documents

  • Video: Route 286/Five Mile Line Road Improvement Project
    document seq 0.00
    Howard R. Ressel (NYSDOT), project engineer, gives a overview of the construction improvements
  • Map: Route 286/Five Mile Line Road Improvement Project
    document seq 0.00
    Produced by New York Department of Transportation